Peel L&P buildings become the first in the UK to achieve net zero carbon status
Peel L&P buildings, including properties in Greater Manchester, become the first in the UK to achieve net zero carbon status
Grade A offices across Greater Manchester, Liverpool and an historic building in Glasgow have been third party verified against UK Green Building Council’s 2019 definition.
11 properties, ranging from 25,000 sq ft to over 120,000 sq ft, including buildings in TraffordCity (Manchester) and MediaCityUK (Salford) are the first in the UK to demonstrate net zero carbon status based on their operational carbon emissions, action taken to reduce those emissions and their renewable energy use.
Princes Dock at Peel L&P’s Liverpool Waters development has also achieved the status of net zero emissions. (Full list below)
Peel L&P has a long track record of leadership on sustainability being the first developer to achieve the BREEAM communities standard at MediaCityUK in 2011 and the first major property company to achieve the energy management standard ISO 50001 in 2015.
The most important action has been to reduce energy demand. Last year alone, Peel L&P invested £859,000 in 66 energy efficiency projects in these offices to benefit tenants by reducing their carbon emissions from energy use by 13%.
Any remaining emissions from the newly verified buildings will be offset through a Verified Carbon Standard tree-planting project in the North West to absorb the same amount of carbon dioxide emissions from the atmosphere.
The announcement has been welcomed by the Mayor of Greater Manchester Andy Burnham who agrees that the verification plays an important role in the city region’s 2038 target response to the climate emergency.
Andy Burnham, Mayor of Greater Manchester, said:
“In our Five-Year Environment Plan we’ve set out our commitment to make Greater Manchester carbon-neutral by 2038. Achieving that will require significant cuts to carbon emissions from homes and workplaces – responsible for about two thirds of emissions across our city-region – with both the public and private sectors playing a vital role.
“Cutting carbon emissions and increasing energy efficiency in the way that Peel L&P have done is not only possible – it’s essential to reducing our carbon footprint and delivering cleaner, more sustainable building stock throughout Greater Manchester.”
Peel L&P’s work to reduce carbon emissions across its assets is part of the company’s first five-year sustainability plan which supports the United Nations Sustainability Development Goals (UN SDGs) to help create a fair and sustainable planet by 2030.
Peel L&P’s Sustainability Director Jo Holden, said:
“The region has set itself ambitious targets for achieving carbon neutrality and we want to demonstrate how we are playing our part by taking action to mitigate climate change. We will re-assess these properties annually, talk to our tenants about their role in reducing carbon emissions and look to increase the number of net zero carbon buildings in our portfolio.”
John Alker, Director of Policy & Places, UK Green Building Council (UKGBC), said:
“Awareness of the climate emergency is at an all-time high, but we now need to embark on a decade of urgent action. The property sector has a huge role to play, so it is fantastic to see this type of leadership from Peel L&P and we are delighted that the UKGBC Framework has helped guide the way. This also supports the green ambitions of some of our great cities, showing that the north can lead the way in the transition to net zero.”
Whole buildings verified as Net Zero Carbon:
• The Venus, TraffordCity
• The Vic, MediaCityUK
• The Alex, MediaCityUK
• Quay West, MediaCityUK
• Digital World Centre, MediaCityUK
• 16 Robertson Street, Glasgow
Office space verified as Net Zero Carbon:
• Peel L&P head office, intu Trafford Centre
Landlord’s emissions verified as Net Zero Carbon:
• Princes Dock, Liverpool Waters – includes No.8, No.10, No.12 Princes Dock and Princes Dock Multi Storey Car Park.
For the last five years, Peel L&P has delivered annual improvements in energy efficiency of 3% in its major assets, due to the hard work of the Energy Champions and the ISO 50001 energy management system.
Over £1.1 million was invested in state-of-the-art energy saving equipment during a recent refurbishment of The Vic at MediaCityUK. As a result, the property is anticipating energy and carbon savings of 60% annually.
Further information on Peel L&P’s five-year sustainability business plan can be found at www.peellandp.co.uk/responsibility
Related stories
Salford Foodbank sets sights on three camels’ worth of donations this Christmas
With less than a week to go before Christmas the Salford Foodbank has set itself the target of raising 1.5…
A Who’s Who of talent! Star cast announced for The Grinch
Griff Rhys Jones joins X-Factor winner Matt Terry as cast is announced for Christmas season at The Lowry with Edward Baker-Duly to star as The Grinch.
Prowise announces recruitment drive with move to MediaCityUK
Dutch education technology specialist, Prowise, is set to invest in the UK by launching its first division outside the Netherlands, occupying 2,500 sq ft in The Greenhouse, MediaCityUK, and aims to recruit around 20 new employees.